[1] L. Wenyuan. Risk assessment of power systems: models, methods, and applications. John Wiley & Sons, 2014.
[2] R. Billinton, Z. Pan, “Historic performance-based distribution system risk assessmen”, IEEE Transactions on Power Delivery, vol. 19, no. 4, pp.1759-1765, 2004.
[3] A. A. Chowdhury, “Distribution system risk assessment based on historical reliability performance”, IEEE International Conference on Electro Information Technology, pp. 7-pp, 2005.
[4] Z. Feng, R. Billinton, “Electric distribution system risk assessment using actual utility reliability data”, Thesis, Degree of Master of Science, University of Saskatchewan, Saskatchewan, Canada, 2006.
[5] G. P. Park, Y. T. Yoon, “Application of ordinal optimization on reliability centered maintenance of distribution system”, European Transactions on Electrical Power, vol. 22, no. 3, pp. 391–401, 2012.
[6] L. Guo, C. X. Guo, W. H. Tang, Q. H. Wu, “Evidence-based approach to power transmission risk assessment with component failure risk analysis”, IET Generation, Transmission & Distribution, vol. 6, no. 7, pp. 665-672, 2012.
[7] M. Aliyari, V. Baghshani, A. Barabadi, “Reliability performance analysis in power distribution system using Weibull distribution-A case study”, IEEE 18th Electric Power Distribution Conference, pp. 1-6, 2013.
[8] A. U. Adoghe, C. O. A. Awosope, J. C. Ekeh, “Asset maintenance planning in electric power distribution network using statistical analysis of outage data”, International Journal of Electrical Power and Energy Systems, vol. 47, pp. 424-435, 2013.
[9] M. Abbasghorbani, H. R. Mashhadi, and Y. Damchi, “Reliability-centred maintenance for circuit breakers in transmission networks”, IET Generation, Transmission & Distribution, vol. 8, no. 9, pp. 1583-1590, 2014.
[10] M. Abbasghorbani, Y. Damchi, H. R. Mashhadi, “Reliability-centered maintenance for overhead transmission lines in composite power system”, International Transactions on Electrical Energy Systems, vol. 2022, pp. 1-11, 2022.
[11] حمید شریفیان، جواد محمودی، علی رحیمی و مهدی علییاری،"تعمیر و نگهداری با محوریت قابلیت اطمینان (RCM) ترانسفورماتورهای توزیع در راستای اجرای چرخه مدیریت سرمایه (EAM)"، بیست و یکمین کنفرانس توزیع برق، اردیبهشت 1395.
[12] S. R. K. Yeddanapudi, Y. Li, J. D. McCalley, A. A. Chowdhury, and W. T. Jewell, "Risk-based allocation of distribution system maintenance resources", IEEE Transactions on Power Delivery, vol. 23, no. 2, pp. 287-295, 2008.
[13] Jahromi, A., M. Fotuhi-Firuzabad, E. Abbasi. "An efficient mixed-integer linear formulation for long-term overhead lines maintenance scheduling in power distribution systems", IEEE Transactions on Power Delivery, vol. 24, no. 4, pp. 2043-2053, 2009.
[14] A. Moradkhani, M. R. Haghifam, S. M. Abedi, "Risk-based maintenance scheduling in the presence of reward penalty scheme", Electric Power Systems Research, vol. 121, pp. 126-133, 2015.
[15] M. K. Tehrani, A. Fereidunian, H. Lesan , “Financial planning for the preventive maintenance of power distribution systems via fuzzy AHP”, Complexity, vol. 21, no. 3, pp. 36-46, 2016.
[16] P. Afzali, F. Keynia, M. Rashidinejad, “A new model for reliability-centered maintenance prioritisation of distribution feeders”, Energy, vol. 171, pp. 701-709, 2019.
[17] J. B. Leite, J. R. S. Mantovani, T. Dokic,Q. Yan, Po-C. Chen, M. Kezunovic, “Resiliency Assessment in distribution networks using gis based predictive risk analytics”, IEEE Transactions on Power Systems, vol. 34, no. 6, pp. 4249-4257, 2019.
[18] N. L. Dehghani,Y. M. Darestani, A. Shafieezadeh, "Optimal life-cycle resilience enhancement of aging power distribution systems: a minlp-based preventive maintenance planning", IEEE Access, vol. 8, pp. 22324- 22334, 2020.
[19] مجید نیریپور، سعید حسوند، حسین فلاحزاده ابرقوئی، «برنامهریزی توسعه ظرفیت با در نظر گرفتن قابلیت اطمینان سیستم بهمنظور تبدیل شبکه توزیع موجود به ریزشبکه»، مجله مهندسی برق دانشگاه تبریز، جلد 47، شماره 2، صفحه 774-761، 1396.
[20] سیدمحمدرضا شریعتی، ایرج احمدی، تقی بارفروشی«مدلسازی تأثیر حضور ترانسفورماتور یدکی بر قابلیت اطمینان مجموعهای از پستهای فوقتوزیع»، مجله مهندسی برق دانشگاه تبریز، جلد 47، شماره 4، صفحه 1497-1489، 1396.
[21] حمید بهنیا، مهدی اخباری «کلیدزنی انتقال در برنامهریزی یکپارچه تعمیرات انتقال و تولید در سیستم قدرت»، مجله مهندسی برق دانشگاه تبریز، جلد 49، شماره 4، صفحه 1525-1517، 1398.
[22] Sand, K., O. Gjerde, D. E. Nordgård. "Current risk exposure in the distribution sector", Initial study. Trondheim, SINTEF Energy Research, 2007.
[23] Nordgård, D. E., K. Sand, I. Wangensteen. "Risk assessment methods applied to electricity distribution system asset management", Reliability, Risk, and Safety, three volume set, pp. 463-470. CRC Press, 200.