[1]      مصطفی رجبی مشهدی، برنامه‌ریزی هم‌زمان انرژی و ذخیره کنترل فرکانس اولیه با در نظر گرفتن قابلیت‌های فنی و محدودیت‌های واقعی واحدهای نیروگاهی، رساله دکتری مهندسی برق قدرت، دانشگاه فردوسی مشهد، مشهد، 1389.
   [2]      A.J. Wood, and B.F. Wollenberg, Power Generation Operation and Control, Wiley Publishing, 1996.
   [3]      R.J. Koessler, J.W. Feltes, and J.R. Willis, “A methodology for management of spinning reserves requirements,” IEEE Power Eng., vol. 1, pp. 584-589, 1999.
   [4]      R. Raineri, S. Rios, D. Schiele, “Technical and economic aspects of ancillary services markets in the electric power industry: an international comparison,” Energy Policy, vol. 34, pp. 1540-1555, 2006.
   [5]      J.F. Restrepo, and F.D. Galiana, “Unit commitment with primary frequency regulation constraints,” IEEE Trans. Power Syst., vol. 20,  no. 4, pp. 1836-1843, 2005.
   [6]      F.D. Galiana, F. Bouffard, J.M. Arroyo, and J.F. Restrepo, “Scheduling and pricing of coupled energy and primary, secondary and tertiary reserves,” Proceedings of the IEEE, vol. 93, no. 11, pp. 1970-1984, 2005.
   [7]      مصطفی رجبی مشهدی، «برنامه‌ریزی هم‌زمان انرژی و ذخیره کنترل فرکانس اولیه با لحاظ کردن قابلیت‌های فنی واحدهای نیروگاهی پیشرفته»، مجله انجمن مهندسین برق و الکترونیک ایران، سال ششم، شماره دوم، 1391.
   [8]      مصطفی رجبی مشهدی، «بررسی و تحلیل اثر استفاده از نرخ بارگیری سریع به‌منظور تأمین ذخیره اولیه بر قیمت برق و نوسانات آن»، مجله انجمن مهندسین برق و الکترونیک ایران، سال نهم، شماره دوم، صفحات 48-39، 1392.
   [9]      M.R. Mashhadi, M.H. Javidi, and M.S. Ghazizadeh, “The impacts of capabilities and constraints of generating unit on simultaneous scheduling of energy and primary reserve,” Electr. Eng., vol. 93, no. 1, pp. 117–126, 2012.
[10]      J.W. O’Sullivan, and M.J. O’Malley, “A new methodology for  the provision of reserve in an isolated power system,” IEEE Trans. Power Syst., vol. 14, no. 2, pp. 519-523, 1999.
[11]      K.A. Papadogiannis, and N.D. Hatziagyriou, “Optimal allocation of primary reserve services in energy markets,” IEEE Trans. Power Syst., vol. 19, no. 1, pp. 519-523, 2004.
[12]      J. Restrepo, Unit Commitment With Primary Frequency Regulation Constraints in Electric Power System, Ph.D. Thesis, McGill University, Montreal, Canada, 2005.
[13]      F. Aminifar, A. Khodaei, “A novel unit commitment approach considering transmission constraints,” 15th ICEE Proceedings, Sharif University of Technology, Tehran, Iran, 2007.
[14]      C.L. Tseng, S.S. Oren, C.S. Cheng, C. Li, A.J. Svoboda, and R.B. Johnson, “A transmission-constrained unit commitment method in power system scheduling,” Decision Support Systems, vol. 24, pp. 297-310, 1999.
[15]      M. Pourakbari-Kasmaei, M. Rashidi-Nejad, and A. Abdollahi, “A novel unit commitment technique considering prohibited operating zones,” Journal of Applied Science, vol. 9, no. 16, pp. 2962-2968, 2009.
[16]      R. Navarro, Dynamic Load Models for Power Systems, Ph.D. Thesis, Lund University, Sweden, 2002.
[17]      R.E. Rosenthal, GAMS: A User's Guide, GAMS Development Corporation, Washington, DC, USA, 2011.
[18]      D. Chattopadhyay, “Application of general algebraic modeling system to power system optimization,” IEEE Transactions on Power Systems, vol. 14, no. 1, pp. 15-22, 1999.
[19]      M. Rouholamini, M. Rashidinejad, and S. Esmaeili, “A new methodology to solve joint energy and primary reserve scheduling,” Journal of technology and optimization, vol. 3, no. 2, pp. 139-147, 2013.
[20]      D. Zimmerma, E. Murillo-Sanchez, Available online at: http://www.pserc.cornell.edu/matpower/, 2011.
[21]      M. Esmaili, H.A. Shayanfar, and N. Amjady, “Congestion management considering voltage security of power systems,” Energy Conversion and Management, vol. 50, pp. 2562–2569, 2009.